Advantage of the offer
The building is situated within the limits of red line.
The building and the lot are both private properties.
The large enclosed surrounding area can be used as chargeable parking (the approval is given): at the day time — for the business center, at night — for the surrounding neighborhood.
In the basement, there is a specially certified bank vault. The new diesel generator (57 kW) ensures the uninterruptable power supply.
What is already done and what stage the project is on
The new technical conditions for heat supply, water supply, water disposal, and electricity supply are approved under the working project for reconstruction.
The technical conditions are approved and the project is designed for power supply cable input to increase the voltage from 85 to 300 kW.
Due to land acquisition, the area of the lot enlarged to 3000 m².
Rent of 16 parking slots (2 of which — for invalids) along the front of the building is agreed and approved, which doubles the front parking area.
The tenders are held, the General Contractor and subcontractors are chosen (construction, engineering systems, facade works).